How much do you know about the technological process of an air - shield dam?

发布时间:2020-10-10 点击量:3530
How much do you know about the technological process of an air - shield dam? Now, I'll explain it in detail for you. I hope it will be helpful to you. Let's find out together!
Technological Process of Air - shield Dam: Sub - base inspection → Surveying and setting out → Setting up formwork for cushion layer → Formwork inspection → Pouring cushion layer concrete.
1. Requirements for the Sub - base: The foundation is laid on the pebble layer, and the bearing capacity of the bearing stratum is 300 Kpa. After joint inspection and acceptance of the foundation by the construction unit, design unit, supervision unit, and the building contractor, the next - step construction can be carried out.
2. The surveying staff of the project department, according to different parts of the air - shield dam bottom plate cushion layer, including the apron, air - shield dam body, stilling basin, and apron slab, respectively measure and mark the elevation of the upper surface of the cushion layer. Control is achieved by driving stakes and stretching wires.
3. The formwork construction workers use (100×100) wooden squares to set up the formwork according to the upper - level line of the cushion layer. After completion, jointly with the supervisor, check the planar dimensions and elevation of the formwork. If they are qualified, the next - step construction can proceed.
4. Commercial concrete is used. The mix ratios of various strength concretes are sent to a laboratory with water - conservancy qualifications for re - testing respectively. Only after passing the tests can they be used.

 

1602296749210336.jpg

5.The concrete is transported by special concrete mixer trucks from the mixing plant, and a concrete truck pump with a boom length of 36m is used for concrete pouring. Before pouring, the construction road from the main road to the working surface should be repaired.
6.The slump of the concrete is 160 - 180mm.
7.The concrete pouring must be carried out continuously, with an intermittent time not exceeding 2 hours.
8.A flat - type vibrator is used for vibrating the cushion layer concrete. After vibrating it densely, workers use a wooden float to level the surface.
9.Concrete curing
  (1) Before the initial setting of the concrete after pouring, avoid water accumulation on the silo surface and direct sunlight exposure.
  (2) After the final setting of the concrete, use the method of watering for curing or cover it with plastic film.
  (3) The concrete curing should be continuous. During the curing period, the surface and all sides of the concrete should always remain moist. The curing time is 28 days.

Shenyang Huada Polymer Materials R & D Center Co., Ltd. was founded in November 2008. It is a private high - tech limited liability company led by Professor Chen Erfan, an academic leader in a university, with his scientific and technological achievements. The company is mainly engaged in the research and development of polymer materials and products, the transformation of high - tech achievements, and industrialization. The company is registered at No. 28, 14th Street, Shenyang Economic and Technological Development Zone, and its office address is located at Room 30 - 31, Hongfa Mingcheng, No. 47 - 2, Shenliao East Road, Tiexi District.
If you want to customize an air - shield dam, you can contact us by phone!