News
more+- Professor Chen Erfan, a leader of our company, was invited to attend the inauguration ceremony for the new location of Shenyang Zhilang Technology Co., Ltd. and visited its research achievements and new products.
- The 4th Annual Meeting of the Special Committee and the 3rd New Materials Science & Technology Conference Held in Hangzhou
- Professor Chen, a leader of our company, participated in the Standardization Technical Committee of the Chemical Industry and Engineering Society of China.
- Warm Congratulations on Our Company Being Awarded the Certificate of High-Tech Enterprise!
- Chairman Chen Erfan Participated in Liaoning International Rubber Technology Exchange Festival as a Specially Invited Expert.
contact
more+Contact Phone:13147811246 13147811216
Landline:13147811246 13147811216
Corporate Email:tech@rdpmcn.com
Address:Hongfa International, Shenliao Road, Tiexi District, Shenyang City, Liaoning Province, P.R.China
Sales Phone:13147811246 13147811216
News
Domestic Air-Cushioned Shield Dam Manufacturers Share Factors Affecting Rubber Sheets and Their Impacts
发布时间:2021-11-02
点击量:4343

Today we are going to discuss the factors affecting rubber panels of domestic air shield dams. Feel free to follow along if you are interested.
Managers of rubber dam projects need to ensure reliable operation in all aspects. They should be familiar with the overall structure, design concepts, construction conditions and existing problems of the project, as well as the operational characteristics of rubber dams. They are required to master operation control, inspection, monitoring, maintenance and repair work, and be capable of conducting partial on-site repairs on dam bags with conventional repair materials and tools.
Daily inspection and maintenance of civil engineering structures shall be performed regularly. Any defects or potential risks must be addressed promptly. Timely repairs for minor damages are essential to prevent further deterioration and avoid operating the facility with faults.

For domestic air shield dams, any faults or damage to electromechanical components including motors, water pumps, air compressors, flanges and gate valves must be troubleshooted, repaired or replaced in a timely manner. Routine maintenance should also be carried out regularly.
The first and fourth stages of the Baihe Rubber Dam are located in suburban areas with long and remote power supply lines. Frequent inspections are required to guarantee stable power supply.
If the forced vibration frequency caused by external forces is close to the natural vibration frequency of the submerged dam body, the vibration will intensify and even lead to resonance. Resonance can cause severe damage to dam bags. Once the internal stress generated during resonance exceeds the allowable stress of the rubber material, the dam bag will be destroyed.
Persistent vibration during operation will result in abrasion, delamination and tearing of dam bags, and in severe cases, complete failure of the dam structure. This will undermine the operational reliability and economic benefits of domestic air shield dam projects.